Issue 4/1995
Characteristics 01 air cleaners and conditioners (part No. 5) 44.3 MBAbstract...The paper deals with evaluation of next 10 filtration apparatuses determinated for indoor air cleaness and IAQ improvement. Dust collection efficiences of the air cleaners have been evaluated. Air flows (air capacities), noise levels and for some cleaners ozone concentrations and light negative ions concentrations in the air have been meassured too. | ŠIMEČEK J., LAJČÍKOVÁ A., MATHAUSEROVÁ Z., JANDÁK Z. | 186 - 188 |
National progamme for designation 01 the Environmentally Friendly Product trade mark 44.3 MBAbstract...- | LITERA J. | 189 - 191 |
Noise of air-conditioning system of the Český rozhlas building in České Budějovice 44.3 MBAbstract...- | NOVÝ R. | 192 - 194 |
Air-conditioning of archive rooms 44.3 MBAbstract...- | ŠIMÁČEK Z. | 195 - 196 |
Air ducts: round or recangular? 44.3 MBAbstract...- | HEMZAL K. | 197 - 198 |
Application of energy standards in air-conditioning and heating system design 44.3 MBAbstract...- | JAŇOUR J. | 199 - 201 |
Noise reduction (linal part) 44.3 MBAbstract...- | NOVÝ R. | 202 - 203 |
Modelling of supporting effect applied in drying of flat materials 44.3 MBAbstract...The paper describes the results of empirical research of impact drying with carrying effect during which the material is heed up by drying environment f1ow. A specia/ly designed slot nozzle wíth attached cylíndrical surface simulates a case where the carrying force is the results of the Coanda effect. | TRÁVNÍČEK Z. | 204 - 206 |
Renovation 01 air-conditioning equipment in the Realcoop office building 44.3 MBAbstract...- | NOVOTNÝ R., NICKEL H. | 208 - 210 |
Overall heat transler coefficient limits lor outer shells of buildings 44.3 MBAbstract...- | ŘEHÁNEK J. | 212 - 216 |
Reconstruction of boiler rooms and district heat exchanger stations 44.3 MB | ŠTORKAN M., BROŽ K. | 218 - 219 |
Reconstruction of housing estate heating system 44.3 MBAbstract...- | ALTMAN F. | 220 - 220 |
Commissioning of air-conditioning and ventilating equipment into operation (part No. 5) 44.3 MB | TOMAN S. | 221 - 225 |
Design and realization 01 liquelied propane burning equipment (part No. 1) 44.3 MB | DOUBKOVÁ D. | 226 - 228 |
Principles of chimney design 44.3 MBAbstract...- | JIROUT V. | 229 - 230 |
Absorption dehumidilication 44.3 MBAbstract...- | ANDRES P. | 232 - 235 |